Skip to content
M&R Welding LLC logo

Rebar Installation & Welding

We installed and welded the rebar for all four floors of the Paycom building in Grapevine — on the general contractor's schedule, floor by floor, with no gap that held up the next pour.


What this covers

Rebar installation is scheduling as much as it is welding: grids have to be tied and welded to spec ahead of each concrete pour, in sequence, without becoming the bottleneck for the trades behind you. On a multi-floor commercial job that means a crew that shows up ready to match the GC's pace, not one that needs the schedule built around it.

Materials & process

Rebar grids are welded and tied to structural spec using stick and MIG processes matched to bar size and position. We also handle the structural adjustments that come up mid-project — guard wall framing, elevator shaft modifications, and other changes flagged once the building is actually going up.

Typical applications

  • Multi-floor commercial rebar installation
  • Elevator shaft and guard wall structural framing
  • Mid-build structural adjustments
  • Foundation and slab reinforcement
Rebar installation at the Paycom building, Grapevine, TX
Rebar grid detail welded for the Paycom building's floor structure
Welding rebar connections at the Paycom building construction site

Related project

Get a quote

Name, phone, and a quick description — that's it.

Call NowGet a Quote